ANALYSIS OF FACTORS CAUSING DELAY OF IMPLEMENTATION OF THE HANAU STADION CONSTRUCTION PROJECT, SERUYAN CENTRAL KALIMANTAN DISTRICT
Abstract
Delay in project time is an event that always occurs on every project. Delays in the project will result in a setback time which will reduce the profit that has been targeted by the contractor handling the project. Time delay can also be caused by poor project management being implemented and also human resource errors in it. The purpose of this study is to provide a risk assessment, identify risks and find out the main factors that influence the time delay in the Hanau STADION Construction Project in Seruyan District, Central Kalimantan Province. and knowing the response to the risks that fall into the category of risks that cannot be tolerated. To achieve the objectives of the study, a literature study was conducted from previous studies to obtain risk variables that affect the time delay in the Hanau STADION Construction Project in Seruyan District, Central Kalimantan Province. respondents in this study were the parties involved in the Hanau STADION Construction Project in Seruyan District, Central Kalimantan Province. The results of the analysis that have been carried out show that 50 risks were identified which caused delays in the implementation of the Hanau Stadium in Seruyan District, Central Kalimantan Province. The main factor influencing the delay in completing the construction project of the Hanau STADION inSeruyan Regency, Central Kalimantan, is the MATERIAL factor With a mean rank of 4.50 the factor is delay in shipping goods, the mean of 4.15 is a factor of the lack of construction materials at the time of implementation, and mean rank 4.05 is a factor in the amount of material lost at the project site during construction.
Downloads
Issue
Section
ASSE 2018